# Ofgem heat network regulation: Heat Network Duty Timetable

> The Heat Network Duty Timetable carries 11 published figures read from 5 sources' own pages, from 14 to 31 day, read 7 November 2026.

Heat Network Check · https://heatnetworkcheck.co.uk/datasets/heat-network-duty-timetable/ · computed 2026-11-08

**Range of the published figures:** 14 to 31 day (range 14 to 31 day; 11 published figures; 9 of 32 sources read publish one).

9 of the 32 named sources read in full publish a figure; 23 publish none, read 7 November 2026.

## By duty

| Breakdown | Median | Range | Sources |
|---|---|---|---|
| duty Temporary authorisation expiry after notice | 14 day | 14 to 14 day | 1 |
| duty Representations on modifying specific authorisation conditions | 28 day | 28 to 28 day | 1 |
| duty Authorisation modification stand-still period | 28 day | 28 to 28 day | 1 |
| duty Representations on a published regulator notice | 21 day | 21 to 21 day | 1 |
| duty Proposed Scottish licence decarbonisation deadline | 3 year | 3 to 3 year | 1 |
| duty Northern Ireland heat networks consultation window | 8 week | 8 to 8 week | 1 |
| duty Complaint escalation to the Energy Ombudsman | 8 week | 8 to 8 week | 2 |
| duty Written demand before disconnection for unpaid charges | 28 day | 28 to 28 day | 1 |
| duty Notice of a price increase or disadvantageous contract change | 31 day | 31 to 31 day | 1 |
| duty Right to end the contract after a change notice | 30 day | 30 to 30 day | 1 |
| duty Proposed shorter Ombudsman decision window | 4 week | 4 to 4 week | 1 |
| duty Proposed shorter escalation window to the Ombudsman | 6 week | 6 to 6 week | 1 |
| duty Representations on a metering and billing notice | 28 day | 28 to 28 day | 1 |
| duty Representations on a regulator notice (Energy Act 2023) | 28 day | 28 to 28 day | 1 |
| duty Representations on a proposed refusal of a Scottish licence | 28 day | 28 to 28 day | 1 |
| duty Earliest effect date of a Scottish enforcement notice | 28 day | 28 to 28 day | 1 |

## Every figure, with its source

One row per source: the figure the source's own page publishes, the page, and the day it was read.

| Source | Figure | Breakdown | Read |
|---|---|---|---|
| [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/) | 31 day | Notice of a price increase or disadvantageous contract change | 2026-11-07 |
| [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/) | 30 day | Right to end the contract after a change notice | 2026-11-07 |
| [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made) | 28 day | Representations on modifying specific authorisation conditions | 2026-11-07 |
| [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made) | 28 day | Authorisation modification stand-still period | 2026-11-07 |
| [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/) | 28 day | Written demand before disconnection for unpaid charges | 2026-11-07 |
| [The Heat Network (Metering and Billing) Regulations 2014 (SI 2014/3120)](https://www.legislation.gov.uk/uksi/2014/3120) | 28 day | Representations on a metering and billing notice | 2026-11-07 |
| [Energy Act 2023, Part 8 (heat networks)](https://www.legislation.gov.uk/ukpga/2023/52/part/8) | 28 day | Representations on a regulator notice (Energy Act 2023) | 2026-11-07 |
| [Heat Networks (Scotland) Act 2021 (asp 9)](https://www.legislation.gov.uk/asp/2021/9) | 28 day | Representations on a proposed refusal of a Scottish licence | 2026-11-07 |
| [Heat Networks (Scotland) Act 2021 (asp 9)](https://www.legislation.gov.uk/asp/2021/9) | 28 day | Earliest effect date of a Scottish enforcement notice | 2026-11-07 |
| [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made) | 21 day | Representations on a published regulator notice | 2026-11-07 |
| [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made) | 14 day | Temporary authorisation expiry after notice | 2026-11-07 |
| [Department for the Economy (NI), heat networks in Northern Ireland](https://www.economy-ni.gov.uk/articles/heat-networks-northern-ireland-protecting-consumers-and-setting-regulation) | 8 week | Northern Ireland heat networks consultation window | 2026-11-07 |
| [Energy Ombudsman, heat networks](https://www.energyombudsman.org/how-we-can-help/heat-networks) | 8 week | Complaint escalation to the Energy Ombudsman | 2026-11-07 |
| [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/) | 8 week | Complaint escalation to the Energy Ombudsman | 2026-11-07 |
| [GOV.UK, fairer faster redress in the energy market: consultation response](https://www.gov.uk/government/consultations/fairer-faster-redress-in-the-energy-market/outcome/fairer-faster-redress-in-the-energy-market-consultation-response-accessible-webpage) | 6 week | Proposed shorter escalation window to the Ombudsman | 2026-11-07 |
| [GOV.UK, fairer faster redress in the energy market: consultation response](https://www.gov.uk/government/consultations/fairer-faster-redress-in-the-energy-market/outcome/fairer-faster-redress-in-the-energy-market-consultation-response-accessible-webpage) | 4 week | Proposed shorter Ombudsman decision window | 2026-11-07 |
| [Scottish Government, heat networks delivery plan, chapter 3: regulatory regime](https://www.gov.scot/publications/heat-networks-delivery-plan/pages/5/) | 3 year | Proposed Scottish licence decarbonisation deadline | 2026-11-07 |

## The sentence each figure was read from (17)

- [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/), read 2026-11-07: "At least 31 days’ advance notice must be given before a price increase or disadvantageous unilateral contract change takes effect."
- [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/), read 2026-11-07: "The notice must inform the consumer that they can end the contract within a period no longer than 30 days."
- [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made), read 2026-11-07: "(3) The specified time may not be less than 28 days beginning with the date the notice is given."
- [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made), read 2026-11-07: "(3) In this regulation, “the end of the usual stand-still period” means the day falling 28 days after the date the notice under regulation 21(7) is published or the day falling 28 days after the date the notice under regulation 22(5) is sent, as the case may be."
- [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/), read 2026-11-07: "Outstanding charges Charges due, demanded in writing at least 28 days earlier, and still unpaid"
- [The Heat Network (Metering and Billing) Regulations 2014 (SI 2014/3120)](https://www.legislation.gov.uk/uksi/2014/3120), read 2026-11-07: "the right to make representations and objections within 28 days beginning with the day on which the notice of intent was received;"
- [Energy Act 2023, Part 8 (heat networks)](https://www.legislation.gov.uk/ukpga/2023/52/part/8), read 2026-11-07: "specifying the period (of not less than 28 days from the date on which the notice is given) within which representations may be made with respect to those provisions,"
- [Heat Networks (Scotland) Act 2021 (asp 9)](https://www.legislation.gov.uk/asp/2021/9), read 2026-11-07: "specifying the period (which is to be not less than 28 days from the date on which the notice is given) within which the applicant may make representations about the proposed refusal to the licensing authority."
- [Heat Networks (Scotland) Act 2021 (asp 9)](https://www.legislation.gov.uk/asp/2021/9), read 2026-11-07: "An enforcement notice must specify the date on which it is to take effect which must be no less than 28 days after the date on which the notice is given."
- [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made), read 2026-11-07: "specifying the period (not being less than 21 days beginning with the date of publication of the notice) within which representations or objections with respect to the proposed order or proposed confirmation may be made,"
- [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made), read 2026-11-07: "at the end of the period of 14 days beginning with the day after the day on which the Regulator gives notice refusing to confer a heat network authorisation in relation to the same regulated activities and the same relevant heat network as are specified in the temporary authorisation; or"
- [Department for the Economy (NI), heat networks in Northern Ireland](https://www.economy-ni.gov.uk/articles/heat-networks-northern-ireland-protecting-consumers-and-setting-regulation), read 2026-11-07: "It is open from 1200 on 06 August 2026 for 8 weeks."
- [Energy Ombudsman, heat networks](https://www.energyombudsman.org/how-we-can-help/heat-networks), read 2026-11-07: "The heat supplier has 8 weeks to resolve the complaint, unless they issue you with a deadlock letter allowing you to come to us sooner."
- [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/), read 2026-11-07: "Whilst it is recommended to pursue the statutory advice route, any consumer can contact the Energy Ombudsman if their complaint has gone unresolved for 8 weeks, or if the authorised person issues a deadlock letter (signifying their rejection of the complaint)."
- [GOV.UK, fairer faster redress in the energy market: consultation response](https://www.gov.uk/government/consultations/fairer-faster-redress-in-the-energy-market/outcome/fairer-faster-redress-in-the-energy-market-consultation-response-accessible-webpage), read 2026-11-07: "Shortening the escalation window for consumers to raise a complaint to the EO from 8 weeks to 6 weeks."
- [GOV.UK, fairer faster redress in the energy market: consultation response](https://www.gov.uk/government/consultations/fairer-faster-redress-in-the-energy-market/outcome/fairer-faster-redress-in-the-energy-market-consultation-response-accessible-webpage), read 2026-11-07: "We will also ask the EO to shorten their time to reach a decision from 6 weeks to 4 weeks."
- [Scottish Government, heat networks delivery plan, chapter 3: regulatory regime](https://www.gov.scot/publications/heat-networks-delivery-plan/pages/5/), read 2026-11-07: "This may be anything between 1 and 3 years of a licence being granted depending on the size of the network and key relevant circumstance."

## Read in full, publishes no figure

- [Ofgem, heat networks regulation (programme page)](https://www.ofgem.gov.uk/energy-regulation/low-carbon/heat-networks), read 2026-11-07: read in full and no accepted figure on the page
- [Ofgem, Comply with heat networks consumer protection regulations](https://www.ofgem.gov.uk/guidance/comply-heat-networks-consumer-protection-regulations), read 2026-11-07: read in full and no accepted figure on the page
- [Ofgem, heat networks: how to prepare for registration](https://www.ofgem.gov.uk/guidance/heat-networks-how-prepare-registration), read 2026-11-07: read in full and no accepted figure on the page
- [Ofgem, heat networks: who needs to register](https://www.ofgem.gov.uk/guidance/heat-networks-who-needs-register), read 2026-11-07: read in full and no accepted figure on the page
- [Ofgem, heat networks regulation: registration guidance](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-registration), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, heat networks regulation: fair pricing and cost allocation](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-fair-pricing-and-cost-allocation), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, heat networks regulation: financial resilience](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-financial-resilience), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, heat networks regulation: regular data reporting](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-regular-data-reporting), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, heat networks regulation: consumer protection](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-consumer-protection), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, consultation: heat networks regulation authorisation conditions](https://www.ofgem.gov.uk/consultation/heat-networks-regulation-authorisation-conditions), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, consultation: authorisation conditions and guidance on measures to mitigate the risk and impact of financial failure](https://www.ofgem.gov.uk/consultation/heat-networks-regulation-authorisation-conditions-and-guidance-measures-mitigate-risk-and-impact-financial-failure), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, Citizen Space: authorisation conditions for registration, nominated operator and notification of changes](https://consult.ofgem.gov.uk/energy-supply/heat-networks-regulation-authorisation-conditions/consultation/subpage.2025-08-07.6924328240), read 2026-09-12: read in full and no accepted figure on the page
- [Ofgem blog, countdown to the launch of new regulatory rules for heat networks](https://www.ofgem.gov.uk/blog/countdown-launch-new-regulatory-rules-heat-networks), read 2026-10-17: read in full and no accepted figure on the page
- [Ofgem, heat networks policy and regulatory programme](https://www.ofgem.gov.uk/energy-policy-and-regulation/policy-and-regulatory-programmes/heat-networks), read 2026-11-07: read in full and no accepted figure on the page
- [SI 2025/269, contents](https://www.legislation.gov.uk/uksi/2025/269/contents/made), read 2026-09-12: read in full and no accepted figure on the page
- [SI 2025/269 regulation 27 (deemed authorisation)](https://www.legislation.gov.uk/uksi/2025/269/regulation/27/made), read 2026-09-12: read in full and no accepted figure on the page
- [SI 2025/269 regulation 56 (redress scheme and micro-business)](https://www.legislation.gov.uk/uksi/2025/269/regulation/56/made), read 2026-09-12: every candidate on the page was refused
- [The Heat Networks (Market Framework) (Great Britain) (Amendment) Regulations 2026 (SI 2026/7)](https://www.legislation.gov.uk/uksi/2026/7/made), read 2026-09-12: every candidate on the page was refused
- [Energy Act 2023, contents](https://www.legislation.gov.uk/ukpga/2023/52/contents), read 2026-10-03: read in full and no accepted figure on the page
- [Scottish Government, heat networks installation and maintenance licence consultation](https://www.gov.scot/publications/installation-maintenance-licence-heat-networks/pages/4/), read 2026-09-12: every candidate on the page was refused
- [GOV.UK, Heat Networks Delivery Unit](https://www.gov.uk/guidance/heat-networks-delivery-unit), read 2026-11-07: every candidate on the page was refused
- [GOV.UK, heat networks regulation: technical standards (HNTAS)](https://www.gov.uk/government/publications/heat-networks-regulation-technical-standards), read 2026-11-07: read in full and no accepted figure on the page
- [Consumer Scotland, heat network regulation: what consumers need to know](https://consumer.scot/blog-posts/heat-network-regulation-what-consumers-need-to-know/), read 2026-09-12: read in full and no accepted figure on the page

## Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2). 9 of the 32 named sources that could be read published a usable figure; 23 published none and are recorded as not published, never filled in; 1 could not be read (blocked, dead or unreachable) and count nowhere. The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source for each breakdown it prices, in day (a source's median where its page yielded several accepted sentences for one breakdown), so a page that gives figures for several breakdowns gives one for each and N counts 11 figures, never sentences; 62 candidate sentence(s) were refused by a reviewer with the reason recorded. The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per duty per nation: who it falls on, the date it binds, the instrument or authorisation condition that creates it, and its status (in force, scheduled, consulted-on, revoked), each quoted verbatim from the instrument and the regulator's own page with the date it was read; the derivation nobody publishes is the JOIN - the four-nation timetable in one table, the count of duties in force against those still scheduled, and changed-since the previous read, which is the news every time a consultation closes or a commencement bites

## Sources

- [Ofgem, heat networks regulation (programme page)](https://www.ofgem.gov.uk/energy-regulation/low-carbon/heat-networks) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, Comply with heat networks consumer protection regulations](https://www.ofgem.gov.uk/guidance/comply-heat-networks-consumer-protection-regulations) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks: how to prepare for registration](https://www.ofgem.gov.uk/guidance/heat-networks-how-prepare-registration) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks: who needs to register](https://www.ofgem.gov.uk/guidance/heat-networks-who-needs-register) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks regulation: registration guidance](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-registration) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks regulation: fair pricing and cost allocation](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-fair-pricing-and-cost-allocation) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks regulation: financial resilience](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-financial-resilience) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks regulation: regular data reporting](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-regular-data-reporting) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks regulation: consumer protection](https://www.ofgem.gov.uk/guidance/heat-networks-regulation-consumer-protection) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, consultation: heat networks regulation authorisation conditions](https://www.ofgem.gov.uk/consultation/heat-networks-regulation-authorisation-conditions) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, consultation: authorisation conditions and guidance on measures to mitigate the risk and impact of financial failure](https://www.ofgem.gov.uk/consultation/heat-networks-regulation-authorisation-conditions-and-guidance-measures-mitigate-risk-and-impact-financial-failure) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, Citizen Space: authorisation conditions for registration, nominated operator and notification of changes](https://consult.ofgem.gov.uk/energy-supply/heat-networks-regulation-authorisation-conditions/consultation/subpage.2025-08-07.6924328240) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem blog, countdown to the launch of new regulatory rules for heat networks](https://www.ofgem.gov.uk/blog/countdown-launch-new-regulatory-rules-heat-networks) (the publisher's own terms; quoted for reporting and comment)
- [Ofgem, heat networks policy and regulatory programme](https://www.ofgem.gov.uk/energy-policy-and-regulation/policy-and-regulatory-programmes/heat-networks) (the publisher's own terms; quoted for reporting and comment)
- [The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (SI 2025/269)](https://www.legislation.gov.uk/uksi/2025/269/made) (the publisher's own terms; quoted for reporting and comment)
- [SI 2025/269, contents](https://www.legislation.gov.uk/uksi/2025/269/contents/made) (the publisher's own terms; quoted for reporting and comment)
- [SI 2025/269 regulation 27 (deemed authorisation)](https://www.legislation.gov.uk/uksi/2025/269/regulation/27/made) (the publisher's own terms; quoted for reporting and comment)
- [SI 2025/269 regulation 56 (redress scheme and micro-business)](https://www.legislation.gov.uk/uksi/2025/269/regulation/56/made) (the publisher's own terms; quoted for reporting and comment)
- [The Heat Networks (Market Framework) (Great Britain) (Amendment) Regulations 2026 (SI 2026/7)](https://www.legislation.gov.uk/uksi/2026/7/made) (the publisher's own terms; quoted for reporting and comment)
- [The Heat Network (Metering and Billing) Regulations 2014 (SI 2014/3120)](https://www.legislation.gov.uk/uksi/2014/3120) (the publisher's own terms; quoted for reporting and comment)
- [Energy Act 2023, Part 8 (heat networks)](https://www.legislation.gov.uk/ukpga/2023/52/part/8) (the publisher's own terms; quoted for reporting and comment)
- [Energy Act 2023, contents](https://www.legislation.gov.uk/ukpga/2023/52/contents) (the publisher's own terms; quoted for reporting and comment)
- [Heat Networks (Scotland) Act 2021 (asp 9)](https://www.legislation.gov.uk/asp/2021/9) (the publisher's own terms; quoted for reporting and comment)
- [Scottish Government, heat networks delivery plan, chapter 3: regulatory regime](https://www.gov.scot/publications/heat-networks-delivery-plan/pages/5/) (the publisher's own terms; quoted for reporting and comment)
- [Scottish Government, heat networks installation and maintenance licence consultation](https://www.gov.scot/publications/installation-maintenance-licence-heat-networks/pages/4/) (the publisher's own terms; quoted for reporting and comment)
- [Department for the Economy (NI), heat networks in Northern Ireland](https://www.economy-ni.gov.uk/articles/heat-networks-northern-ireland-protecting-consumers-and-setting-regulation) (the publisher's own terms; quoted for reporting and comment)
- [GOV.UK, Heat Networks Delivery Unit](https://www.gov.uk/guidance/heat-networks-delivery-unit) (the publisher's own terms; quoted for reporting and comment)
- [GOV.UK, heat networks regulation: technical standards (HNTAS)](https://www.gov.uk/government/publications/heat-networks-regulation-technical-standards) (the publisher's own terms; quoted for reporting and comment)
- [Energy Ombudsman, heat networks](https://www.energyombudsman.org/how-we-can-help/heat-networks) (the publisher's own terms; quoted for reporting and comment)
- [GOV.UK, fairer faster redress in the energy market: consultation response](https://www.gov.uk/government/consultations/fairer-faster-redress-in-the-energy-market/outcome/fairer-faster-redress-in-the-energy-market-consultation-response-accessible-webpage) (the publisher's own terms; quoted for reporting and comment)
- [Consumer Scotland, heat networks: guidance for advisers and caseworkers](https://consumer.scot/publications/heat-networks-guidance-for-advisers-and-caseworkers/) (the publisher's own terms; quoted for reporting and comment)
- [Consumer Scotland, heat network regulation: what consumers need to know](https://consumer.scot/blog-posts/heat-network-regulation-what-consumers-need-to-know/) (the publisher's own terms; quoted for reporting and comment)
- [legislation.gov.uk](https://www.legislation.gov.uk/all?title=heat%20network) (the publisher's own terms; quoted for reporting and comment)

## Cite or embed

- The Heat Network Duty Timetable carries 11 published figures read from 5 sources' own pages, from 14 to 31 day, read 7 November 2026.
- 9 of the 32 named sources read in full publish a figure; 23 publish none, read 7 November 2026.
- Heat Network Duty Timetable, duty Temporary authorisation expiry after notice: median 14 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Representations on modifying specific authorisation conditions: median 28 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Authorisation modification stand-still period: median 28 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Representations on a published regulator notice: median 21 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Proposed Scottish licence decarbonisation deadline: median 3 year across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Northern Ireland heat networks consultation window: median 8 week across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Complaint escalation to the Energy Ombudsman: median 8 week across 2 sources, read 7 November 2026.
- Heat Network Duty Timetable, duty Written demand before disconnection for unpaid charges: median 28 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Notice of a price increase or disadvantageous contract change: median 31 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Right to end the contract after a change notice: median 30 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Proposed shorter Ombudsman decision window: median 4 week across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Proposed shorter escalation window to the Ombudsman: median 6 week across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Representations on a metering and billing notice: median 28 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Representations on a regulator notice (Energy Act 2023): median 28 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Representations on a proposed refusal of a Scottish licence: median 28 day across 1 source, read 7 November 2026.
- Heat Network Duty Timetable, duty Earliest effect date of a Scottish enforcement notice: median 28 day across 1 source, read 7 November 2026.

Cite as: "heatnetworkcheck.co.uk Heat Network Duty Timetable", updated 2026-11-08, https://heatnetworkcheck.co.uk/datasets/heat-network-duty-timetable/.

CSV: https://heatnetworkcheck.co.uk/datasets/heat-network-duty-timetable.csv
JSON: https://heatnetworkcheck.co.uk/datasets/heat-network-duty-timetable.json
Embed (plain HTML, static link back): see https://heatnetworkcheck.co.uk/datasets/heat-network-duty-timetable/#median